Customization: | Available |
---|---|
Type: | Concrete Pump |
Shotcrete Type: | Wet |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | HGY32C | |||
Performance | Max. Radius of Placing Boom(m) | 32 | ||
Free Standing Height ( to the joint between the end of the boom and swivel table(m) |
22.1 | |||
slewing range( º ) | 400 | |||
working temperature(ºC) | 0~60 | |||
Total Weight(kg) | 20800 | |||
Counter Weight(kg) | 2930 | |||
Power (subject to customers requirement) | 380V/50HZ | |||
Motor | Model No. | Y2 -200L-4 | ||
Power(KW) | 18.5kw | |||
Hydraulic System | System Pressure (Mpa) | 32 | ||
Flow(L/min) | 47 | |||
Oil Tank capacity(L) | 280 | |||
Type of Hydraulic Oil | Operating Ambient Temperature35ºC~50ºC | L- HM68 | ||
Operating Ambient Temperature5ºC~35ºC | L- HM46 | |||
Operating Ambient Temperature-15ºC~5ºC | L- HM32 | |||
Control Mode | Cable Remote control | |||
Wireless Remote Control | ||||
Wired Remote Control | ||||
Cleaning Mode for Delivery Pipeline | Water Wash/Dry Cleaning | |||
Section of Tubular Column(m×m) | 0.75×0.75 | |||
ARM | Boom Mode | Fully Hydraulic | ||
Delivery Pipeline Diameter | DN125mm | |||
Length of End Hose(″× m) | 5"×3 | |||
1st Section | Length (m) | 11.3 | ||
Articulation | 0°~ 90° | |||
2nd Section | Length (m) | 6.85 | ||
Articulation | 0°~180° | |||
3nd Section | Length (m) | 6.95 | ||
Articulation | 0°~180° | |||
4nd Section | Length (m) | 6.9 | ||
Articulation | 0°~180° | |||
Climbing | Climbing Type | Cylinder Jack Lifting | ||
Internal Climbing Step Distance(m) | 0.52 | |||
Floor Frame | Hole Prepared in Floor | |||
Shaft Frame | Size of Climbing2.0m - 2.7m | |||
Min Space Between Internal Climbing Frames |
Climbing(m) | 3.0 | ||
Placing Concrete(m) | 6.0 | |||
Rest(m) | 6.0 |