• 32m Concrete Placing Boom for Construction
  • 32m Concrete Placing Boom for Construction
  • 32m Concrete Placing Boom for Construction
  • 32m Concrete Placing Boom for Construction
  • 32m Concrete Placing Boom for Construction
  • 32m Concrete Placing Boom for Construction

32m Concrete Placing Boom for Construction

Type: Concrete Pump
Shotcrete Type: Wet
Machining Process: Hydraulic
Structure: Rotor Type
Productivity: 240m²/h
Feeding Height: 1400mm
Customization:

Contact Supplier

Diamond Member Since 2015

Suppliers with verified business licenses

Rating: 5.0/5

Basic Info.

Model NO.
SAMB2
Vibrating Amplitude
2.0mm
Certification
ISO9001: 2000, CE
Condition
New
Color
Yellow
Transport Package
Sea Worthy Packing
Specification
CE
Trademark
Super-above
Origin
Jiangsu, China
HS Code
8474390000
Production Capacity
100PC/Year

Product Description

PRODUCT DESCRIPTION

High quality best Concrete Placing Boom

32m Concrete Placing Boom for Construction
32m Concrete Placing Boom for Construction

Technical data:
Model HGY32C
Performance Max. Radius of Placing Boom(m) 32
Free Standing Height ( to the joint between the end 
of the boom and swivel table(m)
22.1
slewing range( º  )  400
working temperature(ºC) 0~60
Total Weight(kg) 20800
Counter Weight(kg) 2930
Power (subject to customers requirement) 380V/50HZ
         Motor Model No. Y2 -200L-4
Power(KW) 18.5kw
Hydraulic System System Pressure (Mpa) 32
Flow(L/min) 47
Oil Tank capacity(L) 280
Type of Hydraulic Oil Operating Ambient Temperature35ºC~50ºC L- HM68
Operating Ambient Temperature5ºC~35ºC L- HM46
Operating Ambient Temperature-15ºC~5ºC L- HM32
Control Mode Cable Remote control
Wireless Remote Control
 Wired Remote Control
Cleaning Mode for Delivery Pipeline Water Wash/Dry Cleaning
Section of Tubular Column(m×m) 0.75×0.75
ARM Boom Mode Fully Hydraulic
Delivery Pipeline Diameter DN125mm
Length of End Hose(″× m) 5"×3
1st Section Length (m) 11.3
Articulation 0°~ 90°
2nd Section Length (m) 6.85
Articulation 0°~180°
3nd Section Length (m) 6.95
Articulation 0°~180°
4nd Section Length (m) 6.9
Articulation 0°~180°
Climbing Climbing Type Cylinder Jack Lifting
Internal Climbing Step Distance(m) 0.52
Floor Frame Hole Prepared in Floor
Shaft Frame Size of Climbing2.0m - 2.7m
Min Space Between 
Internal Climbing Frames
Climbing(m) 3.0
Placing Concrete(m) 6.0
Rest(m) 6.0


Advantages:
A.Boom
The arced boom structure is optimized by applying CPU design. The boom adopted high-strength steel plate for production with scientific process. It features beautiful appearance, superior rigidity and intensity, 
ensuring excellent and reliable quality.
B. Hydraulic system
C  series products adopted Germany Rexroth solenoid directional control valve and balance valve
 with secondary overflow. It has effectively avoided the potential damages of boom
 which might be caused by over speed movement when the boom drops down, and sudden 
increase of oil cylinder's pressure under external forces, thus the reliability of the boom
 has been increased.
C.Inner Hydraulic Oil Tank
Inner hydraulic oil tank renders a compact structure and free swivel. It gives big 
convenient for installation, dismounting and maintenance, which ensure longer service 
life and excellent performance.
D.Climbing Facility
As a rectangular frame structure, the climbing facility is flexible, reliable and convenient
for dismounting.
E.Slewing Mechanism and Reducer
Slewing reducer adopted products made by the world famous brand of Italy Comer, with 
a great torsion. Being accompanied with the integrated slewing balance valve made by 
Germany Hawei, it achieves smooth operation and reliable and stable performance.
F.Wireless Remote Controller
C series products adopt industry-exclusive analogue wireless remote controller made by Taiwan TELECRANE, which is easy and convenient to operate, highly resistant to
disturbance and reliable in performance.Each series are accompanied with wired remote controller for use in necessity.
G.Electric Control System
The electric control system adopted world famous brand of electric components, such 
as Japanese Omron and French Schneider. The multi automatic protection is set up in
the control program, so as to avoid misoperation and ensure the system's reliability.
H.Column
The column is made of high-strength steel plate in square shape, with nice appearance,
rigidness and intensity, as well as high reliability.

32m Concrete Placing Boom for Construction

32m Concrete Placing Boom for Construction
32m Concrete Placing Boom for Construction


CONTACT US




 

Send your message to this supplier

*From:
*To:
avatar Mr. Jame Sun
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

Diamond Member Since 2015

Suppliers with verified business licenses

Rating: 5.0/5
Management System Certification
ISO 9001, ISO 9000
Terms of Payment
LC, T/T, PayPal, Western Union, Small-amount payment